
Announcement
Collapse
No announcement yet.
User Profile
Collapse
-
Nope, it will wait until after the routine is released for production....
- Likes 2
-
I saw something similar a couple of months ago. Think I re-saved and re-opened the routine and that "fixed" it. Been too long and wasn't...
Leave a comment:
-
-
-
If you use Fixture Builder you can do screen shots from it. Or a cad program
Leave a comment:
-
-
Generic Features are your friends.
Measure Cir1 and Cir2
Assuming that Cir1 is to the left and Cir2 is to the right in the XY plane....
Leave a comment:
-
If the drawing specify Y14.5 then that document specifies that All tolerances are absolute no matter how many bazillion zeros you go out to. I.E. ...
- Likes 3
Leave a comment:
-
I have lots of CMM button pushers and very, very few skilled CMM operators.. This code lets them calibrate a probe parameter set at any time with minimal...
Leave a comment:
-
Need to study flow control. What is happening is a menu appears with various numbered selections. One of the selections is calibration. If you enter...
- Likes 1
Leave a comment:
-
??? Don't see that except in the middle of the code. ???
This code is the bare bones of a menu system with options for Probe Calibration,...
-
I probably stole it from you. I don't have many flashes of brilliance but I'm an excellent code thief.
-
Code:TRACEFIELD/DISPLAY=YES,REPORT=NO,DISPLAY MESSAGE=Inspection Lot ; Inspection Lot : $$ NO, $$ NO,
- Likes 2
Leave a comment:
No activity results to display
Show More
Leave a comment: