I'm trying for the first time to do a ball bar calibration. The CMM has just had it's yearly calibration & my boss wants us to start to do monthly ball bar calibration to find out when the CMM would need to be calibated next. So this would be the first run. The bad news I've never done one before The guy who calibrated themachine was nice enough to give me a sheet with what position I would place the ball bar in to do the calibration but that is about as far as I get. Can anyone explain how to go about this &/or if someone has a simple program I can take a look at? Thanks
PC DMIS 4.2
Iota 2204
Sharpe 32 controller
PC DMIS 4.2
Iota 2204
Sharpe 32 controller
Comment