Anyone have advice for writing an automated routine to calibrate all the probes in a rack?
When using a "Auto Calibrate" command and after finishing calibration in a A90,B180 position the ph10 wants to rotate to A0,B0 immediately after. It does this before reading the move command I have inserted to avoid this problem. This causes the tip (depends on length) to rotate into the table.
I realize there are setup options in the calibration for clearance along the shank vector but why is it rotating to A0,B0 before moving to the rack?
Anyone with a program example of how to avoid this would be appreciated.
When using a "Auto Calibrate" command and after finishing calibration in a A90,B180 position the ph10 wants to rotate to A0,B0 immediately after. It does this before reading the move command I have inserted to avoid this problem. This causes the tip (depends on length) to rotate into the table.
I realize there are setup options in the calibration for clearance along the shank vector but why is it rotating to A0,B0 before moving to the rack?
Anyone with a program example of how to avoid this would be appreciated.
Comment