Running BROWN & SHARP WITH PC-DMIS 3.7 ,
Our Customer complained that the part is too long ( 3 mm. long from Nominal ) in Z dicrtion.,( part is going over mating part).alignement was done while part on fixture with 3 tooling balls.
I checked the part and was I.5 MM. short ( from nominal) .
we both are confused, on where problem the is .
in my reading for T value for length, I have the deviation in MINUS.
PROBE USED TO CHECK THIS DIM. IS A90:B90, I VERIFIED THE CAL. WITH BOTH DCC & MANUAL, CALIBRATION and there was no much difference.
Please, what could go wrong. in my check and what could go wrong in customer side.
Waiting for your help.
Thanks
Our Customer complained that the part is too long ( 3 mm. long from Nominal ) in Z dicrtion.,( part is going over mating part).alignement was done while part on fixture with 3 tooling balls.
I checked the part and was I.5 MM. short ( from nominal) .
we both are confused, on where problem the is .
in my reading for T value for length, I have the deviation in MINUS.
PROBE USED TO CHECK THIS DIM. IS A90:B90, I VERIFIED THE CAL. WITH BOTH DCC & MANUAL, CALIBRATION and there was no much difference.
Please, what could go wrong. in my check and what could go wrong in customer side.
Waiting for your help.
Thanks
Comment