Quick question pertaining to Runout,
As a rule I was told, If you pick the datum last you will never go wrong??
I this true?
I construted a circle (cone with plane) and call it out to Datum -B-,
the results was no deviation.
If I reverse the picks (datum 1st) the results does have deviation which
I believe to be correct.
Thanks in advance for the input.
Jay Gus
Runout
Collapse
Related Topics
Collapse
-
by FCGomesNo idea if anyone can answer this or not.
I am having a problem with runout and total runout.
When I measure features off a combined datum,...-
Channel: PC-DMIS for CMMs
04-22-2009, 02:05 PM -
-
by NetterWe are trying to correlate the runout of a OD back to an ID using the CMM and indicator. I printed the text analysis of the runout for every point taken....
-
Channel: PC-DMIS for CMMs
11-03-2008, 01:12 PM -
-
by ADAM WALLACEI know this is more a GD&T question more then a cmm question. Is it a ligit to call two plane surfaces that are to be parallel to eachother as a total...
-
Channel: PC-DMIS for CMMs
11-08-2013, 02:58 PM -
-
by Spencer_23Trying to report a runout of a surface to a surface and a face using xact measure seems to give me the right deviation but if I turn or graphics it seems...
-
Channel: PC-DMIS for CMMs
07-22-2015, 12:06 PM -
-
by WolfManI have a callout on an ID runout .002 -B-. Datum B is another OD.
So, the roundness of the ID is .0000. The actual location is X.0 Y .002....-
Channel: PC-DMIS for CMMs
04-24-2016, 09:00 PM -