    Quick question pertaining to Runout,

    As a rule I was told, If you pick the datum last you will never go wrong??
    I this true?

    I construted a circle (cone with plane) and call it out to Datum -B-,
    the results was no deviation.
    If I reverse the picks (datum 1st) the results does have deviation which
    I believe to be correct.

    Thanks in advance for the input.

    Jay Gus

Related Topics

Collapse

  • FCGomes
    Runout and Total Runout
    by FCGomes
    No idea if anyone can answer this or not.
    I am having a problem with runout and total runout.
    When I measure features off a combined datum,...
    04-22-2009, 02:05 PM
  • Netter
    Runout calculation
    by Netter
    We are trying to correlate the runout of a OD back to an ID using the CMM and indicator. I printed the text analysis of the runout for every point taken....
    11-03-2008, 01:12 PM
  • ADAM WALLACE
    total runout queston
    by ADAM WALLACE
    I know this is more a GD&T question more then a cmm question. Is it a ligit to call two plane surfaces that are to be parallel to eachother as a total...
    11-08-2013, 02:58 PM
  • Spencer_23
    Thinking this may be a glich
    by Spencer_23
    Trying to report a runout of a surface to a surface and a face using xact measure seems to give me the right deviation but if I turn or graphics it seems...
    07-22-2015, 12:06 PM
  • WolfMan
    runout
    by WolfMan
    I have a callout on an ID runout .002 -B-. Datum B is another OD.

    So, the roundness of the ID is .0000. The actual location is X.0 Y .002....
    04-24-2016, 09:00 PM
Working...
X
😀
🥰
🤢
😎
😡
👍
👎