True Position woes

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Roger Kilpatrick
    replied
    If your alignment meets the requirements of the feature control frame (fcf)then you should not have to use a datum in your output, however if your fcf allows MMC or LMC to be applied to the datum feature then you would need to use it in your output.

    Leave a comment:


  • Jonathan S
    started a topic True Position woes

    True Position woes

    If you were to report a true position for a hole in 2 axes using another hole as a datum, shouldn't the calculated deviation be the same if you align in the same 2 axes to the datum hole and report true position without using a datum?